The client had received over 500 vendor P&IDs for package equipment — including skids, compressors as part of a downstream refinery expansion.
By Anand GeorgeReal-World Case Studies
Showing 1 to 6 of 7 total case studies
Manual annotation across this volume would have taken several engineers multiple weeks — with high chances of inconsistency, error, and duplicated effort.
By Anand GeorgeThese small errors broke tag associations in downstream MTOs and created costly rework. Manual correction was slow, and internal teams lacked a structured way to decide.
By Anand GeorgeThe client worked with P&IDs from multiple EPCs, each using different symbology sets for inline instruments like flow transmitters, and pressure indicators.
By Anand GeorgeThese drawings were delivered in PDF format — scanned, unstructured, and unusable in SmartPlant P&ID without significant rework.
By Anand GeorgeThe client’s project involved standard utility packages where P&IDs often repeated the same control loop structure - a valve, bypass line, and pressure transmitter.
By Anand George